refractive index of cyclohexane

njdot standard construction details 2019

Have municipality requirements - special castings, construction criteria, facility specifications, etc. Only language that is required for specifications, and not language required to clarify the plans, should be included in the Special Provisions. Finalize Tie Sheets according to initial design review comments, Clearing site area, if the project involves only demolition, Beginning and end of project (state/ federal), stations and federal numbers shown; stops and resumes shown, Limits of removal of concrete base and surface courses, and removal of bituminous concrete overlay clearly shown, All pay items are indicated; contract quantities are shown on plans and estimate sheets and specified in the standard or special provisions, Show existing and proposed profile, superimposed, Show roadway slopes and vertical curve information, Label existing and proposed elevations and structures, Finalize according to initial design review comments, Show road and ramp baseline and station numbers, If applicable, label top and bottom of slope or location to match existing slope, Show drainage appurtenances and label inverts, Show traffic flow during each stage of construction, including the transition from i.e. Estimated quantities of structural steel and shear connectors. The transmittal memo must note if there are none. Doing Business Are the ultimate capacity, maximum driving capacity and estimated and/or minimum tip elevation of piles correctly shown on the plans? Have provisions been made for alternating traffic during night hours, if required? The Master Special Provisions will be developed combining all the inputs from the various SDG(s) as well as deleting all hidden text and SI specification text that does not apply to the project. Lengths of spans from center to center of bearings, Locations of subsurface and above ground utilities and complete information, General appearances of the completed structure, Approximate original ground line and assumed rock line, Minimum vertical clearance (actual and required), Locations of fixed and expansion bearings, Approximate clearances (actual and required), Transverse dimensions of the superstructure, Location, spacing and clearances of horizontal reinforcement steel in the footing, Typical reinforcement steel locations, spacing and clearances, Locations of horizontal construction joints, Relative pile locations in completed foundation, Typical reinforcement steel locations, spacing, cover and clearances, Relative pile locations in completed foundations. signage, and detour signage, Include notes on transitions between stages, Include a legend for signs and associated dimensions, Show details for signs that need to be made just for this project. All pay items are indicated, contract quantities are shown on plans and estimate sheets and specified in the standard or Special Provisions. Notes It is hereby certified that the CONSULTANT has performed the necessary quality control and quality assurance tasks for the project and specifically for those applicable items as shown on the attached checklist. The minimum information is: Estimated quantities of items incorporated on the sheet. Abbreviation of words shall generally be avoided, and those abbreviations which are not in common use shall be explained. Under no circumstances shall the information on the Investor Page constitute an offer to sell securities or the solicitation of an offer to buy securities and should not be relied upon to provide specific offering information in connection with any issuance, sale, resale, or remarketing of bonds, notes, or other obligations. FAQs He is competent in Highway/Roadway projects involving new design . The State of NJ site may contain optional links, Have proper title blocks been provided on the jurisdiction map and are they complete? Department of Transportation Overview In conceiving, scoping and designing projects, the NJDOT will consider the needs of all road users and neighbors. in-depth review of NJDOT Phase II inspection reports of scour critical bridges . Has the item, Clearing Site for Structures been established for removal of structures other than bridges? Report Road condition, Delaware's Governor Press Releases General Submittal Procedures and Requirements parties that are provided as a convenience, such as Google Translate. A status of any outstanding issues, including any changes to the unique features of the project relative to the construction. **** Minimum Pile Tip Elevation: A minimum pile penetration should only be specified if necessary to ensure that all of the applicable limit states are met, e.g., lateral deflection, uplift, scour, down drag and pile group settlement. Abutment form panel arrangement and scoring, Pay limits for foundation and bridge excavation, Granite masonry or Stainless Steel Pier Protection. (answer N/A if the permit is not required), a. US Coast Guard Bridge Permit, b. US Army Corps of Engineers Permit, e. NJDEP Waterfront Development Permit, f. NJ Pinelands Commission Public Development Approval, g. NJFWPA Freshwater Wetlands Permit, h. NJDEP Coastal Wetlands Permit, i. NJDEP Stream Encroachment permit, j. Green Acres/ State House Commission Approval, l. Water Quality Certificate, m. D&R Canal Commission Approval, n. NJFWPA Transition Area Waiver, o. Other ______________ (a Dam Safety Permit, Water Lowering Permit, or other miscellaneous permit). Louis Berger. Do the construction plans include all environmental commitments? Sections at pertinent locations For Private Developer projects, Major Access Permits may directly request review of the specifications by the appropriate SDG(s). Shear Lock Device Details Division 06 - Asphalt Bases and Pavements. Has the designer properly incorporated the recommendations of the Pavement Design Report into the plans and specifications? Estimated Quantities The Standard Plans and Standard Specifications are intended for the Nevada Department of Transportation's (NDOT) design and construction applications. Quality Assurance or in house Production Team will provide the latest federal wage rate call outs. If you access one of these websites, remember that NJTA has not participated in the preparation, compilation, or selection of information on any other website for purposes of reaching the investing public, and NJTA assumes no responsibility or liability for the views, content, or accuracy of any other website. Translate is an online service for which the user pays nothing to obtain a of NJ site nor its operators review any of the services, information and/or This usually indicates: 7. Has the telephone service inquiry been confirmed in writing? The Contractor shall conduct PDA measurements and CAPWAP analysis for those designated piles, or as directed by the Resident Engineer The information presented hereon is for informational purposes only and is not guaranteed to be correct. Have wetland mitigation planting requirements been addressed? Has the summer vacation season impact been accounted for on the construction schedule, if applicable? E-10 LIGHTING STANDARD ANCHOR BOLT DETAILS. This information is provided by NJTA on a voluntary basis to assist the investing public, including bondholders, rating analysts, financial advisors, or any other members of the investment community. Required Driving Resistance for Determination of the Bearing Value using PDA and CAPWAP** f. Painting of existing structures, g. Environmental restrictions (fish spawning, etc.). Have construction details for temporary or proposed crash cushions showing the layout, configuration, and appropriate weights been included in the plans? Extent of removal and staging These drawings show the details of various construction items and are used in conjunction with the Standard Specifications. Information on our website is not intended to be the sole basis of making an investment decision. -Read Full Dislaimer. The Designer must refer to the respective BDC Announcement that has issued the most current SI(s), other issued BDC(s), Corrective Action Notices (CAN(s)), Quality Improvement Advisories (QIA(s)) and other detailed instructions on completing the specifications. Email: dotpublic@delaware.gov, About DelDOT 4. purported language translation. Have all erosion control items been included and are they in conformance with report recommendations (including utility excavations)? Has a wetland mitigation plan been prepared and approved by NJDEP? Have permits or agreements required with other authorities been obtained - Turnpike, A.C. Expressway? of NJ site nor its operators review any of the services, information and/or For Roadway involvement it would be sent to Quality Assurance. Carson City, Nevada 89712. When misinterpretation is possible, the limits of pay items shall be clearly indicated on the corresponding details of structure. For structures over waterways, is the information on the structural plans consistent with the Scour report? The relationship between the metric and U.S. customary values is neither an exact (soft) conversion nor a completely rationalized (hard) conversion. E-09 TRANSFORMER BASE AND POLE GROUNDING DETAILS. The purpose of the Environmental Plan Sheet is to provide the Project Manager, designer, Resident Engineer and construction contractor an easy way to monitor, update and implement during construction all environmental commitments and permit conditions on a project. It will also graphically indicate the location of any sensitive environmental resources, land uses and/ or other properties. It indicates: This sheet is a schematic outline with general information necessary to assist bidders in determining the extent of the work. Archeological restrictions will not affect construction productivity? This may include references to other sections of the Standard Specifications. Division 02 - Earthwork. The user is on notice that neither the State Is the information on the structural plans consistent with the Foundation report? Information required to be provided pursuant to NJTAs continuing disclosure undertakings entered into pursuant to Rule 15c2- 12(b)(5) of the Securities and Exchange Commission is available on the Electronic Municipal Market Access (EMMA) system of the Municipal Securities Rulemaking Board located at www.emma.msrb.org. Has sufficient room been provided for entrance and exit to the work zone for equipment and materials supply deliveries? These may indicate: Conglomerations of "Typical Details", such as Foundation Excavation, Structural Details, Wall Sections, etc. This is usually a section taken through the plan view. Relative position of footings There may be other documents containing relevant, material information regarding NJTA which may be available from other sources, including, but not limited to, www.emma.msrb.org. Jan 2015 - May 20161 year 5 months. Has existing curve data been re-established in the field? A scale of 1" = 100' or 1" = 200' is desirable. The specifics of a project may require modifying a standard specification to create a non-standard item. Materials - specifies the materials to be used and how they will be tested. 2022Title: NYSDOT LRFD BRIDGE DESIGN . Have utility companies prepared their company plans and estimates? This checklist is a comprehensive tool designed to assist the designer in ensuring that the contract documents are developed in accordance with applicable standards and guidelines. All proposed and existing roadside safety treatments conform to current NJDOT standards (guiderail, guiderail end treatments, crash cushions, sign supports, etc. The State of NJ site may contain optional links, Does the information in the typical sections, tie and grade sheets and the construction plan sheets agree with the Design Exception? Has adequate roadway width been made available for performing construction activities and for maintaining traffic as required in the traffic control plans? Phone: (775) 888-7070. Are other excavation items other than Roadway Excavation, Unclassified required? Has the proper legend been provided on the jurisdiction map and is it complete? to perform the work without affecting traffic, utilities and properties? Please turn on JavaScript and try again. Jun 2002 - Sep 202018 years 4 months. Roadway Plan Development 5. The NJDOT e-STIP reports financial information, tracks and archives amendment and modification actions, and promotes interagency collaboration. Factored Axial Compression Resistance* (* see at end of this subheading) Real Time Traffic Has the electric service inquiry been confirmed in writing? For both consultant and in-house projects the Designers submission must include the latest information as provided by the Project Manager or other Department units (submitted to the Designer in advance) to complete all requirements covered by the SPIS forms and previous comments. Estimated Pile Tip Elevation Toll Free: (800) 652 5600 Have overhead electrical lines and utilities that may affect construction methods and equipment (such as high tension lines and crane work) been addressed? e. Material Availability - Is lead time required for steel, electrical, fabrication, micro tunnel equipment, etc. Has the required information such as load center wiring diagrams, complete CALA printout including specifications been provided? Weather & Travel, Contact Us Has reduced productivity due to levels protection been included in the contract time? In addition, all Designers are required to submit the Final Design Checklist Certification. Pile type, size, and the associated material properties. The SDG(s) will provide a printed copy of their revised Project Specific SIportions and FDS review comments to Quality Assurance for resolution and for the DPS&E development and Certification by the Designer (outstanding issues will be resolved prior to submitting the DPS&E). Batter of piles Anticipated conditions/constraints that may result from required construction permits. The user is on notice that neither the State Have impacts due to community events such as parades, conventions and sporting events been accounted for on the construction schedule, if applicable? ), Provide additional column for cost sharing quantity breakout totals if there are more than one federal project number and/or third party participation, Check if two or more routes are involved, or routes other than NJDOT, Check with Quality Assurance for items participating and non-participating under NJDOT jurisdiction, Suitable amount of if and where quantities provided on possible extra work items, not to exceed 10% of the quantity (contact specifications engineer for prior approval), Other if and where directed quantities should only be provided where the Department wants to insulate itself from specific risk of quantity deviation, or as indicated on the sample plans, Do not duplicate items, i.e., reset castings vs. reset casting, sanitary sewer, Show all typical sections, labeled by station numbers, Show proposed conditions superimposed on existing conditions, List materials, show grades, label thicknesses and widths. Do the plans, specifications and bar chart indicate the required consolidation/stabilization time and associated construction sequence for the roadway and foundation construction/ pile driving? The State of NJ site may contain optional links, Design values are presented in this document in both metric and U.S. customary units and were developed independently within each system. ), Underground utilities, drainage facilities, and footings for structures do not interfere with the installation of guiderail posts. - The NYSDOT Standard Specifications is a body of directions and requirements for commonly used items of construction for bridge and highway . Is ROW available, if advanced utility relocation is required? In Delaware: (302) 760 2080 The user is on notice that neither the State Conditions of the Stream Encroachment Permit have been incorporated in the plans, if applicable. Details of epoxy seal coat payment lines. Toll Schedules, Toll Calculators, & Discount Programs, BF-01 BRIDGE FENCING SAFETY WALK AND PARAPET MOUNTED, BF-03 BRIDGE FENCING BARRIER PARAPET MOUNTED, BR-10 LAMINATED ELASTOMERIC BEARING DETAILS, BR-15 PARAPET LIGHTING BLISTER AND TYPE D JUNCTION BOX DETAILS, BR-16 BOX GIRDER HATCH COVER AND DRAINAGE DETAILS, CM-01 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, GENERAL TRUSS AND SIGN LAYOUT, CM-02 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, PLAN AND ELEVATION - MAINLINE STRUCTURE, CM-03 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, PLAN AND ELEVATION - RAMP STRUCTURE, CM-04 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, TRUSS AND FIELD SPLICE DETAILS, CM-05 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, TRUSS AND FENCE DETAILS, CM-06 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, DOOR DETAILS, CM-07 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, END FRAME DETAILS, CM-08 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, ACCESS LADDER AND PLATFORM DETAILS, CM-09 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, CABLE ROUTING AND HCMS MOUNTING DETAILS, CM-10 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BILL OF MATERIALS, CM-11 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BRACKET DETAILS - 1, CM-12 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BRACKET DETAILS - 2, CU-02 CONCRETE SIDEWALK AND CURB RAMP DETAILS, CU-03 LIP CURB AND CONCRETE CURB TRANSITIONS FOR GUIDE RAIL, CU-04 LIP CURB AND INLET TREATMENT AT BRIDGE STRUCTURES, DR-04 ALTERATIONS OF MANHOLES, INLETS AND MISCELLANEOUS DETAILS, DR-05 CONCRETE GUTTER AND SLOPE DRAIN DETAILS, DR-09 BLEEDER DRAINS, UNDERDRAINS AND SUBBASE OUTLET DRAIN, E-04 TYPE H POLE-TOP LUMINAIRE MOUNTING ASSEMBLIES, E-05 TYPE V POLE-TOP LUMINAIRE MOUNTING ASSEMBLIES, E-06 HIGHMAST LIGHTING STANDARD DETAILS - 1, E-07 HIGHMAST LIGHTING STANDARD DETAILS - 2, E-09 TRANSFORMER BASE AND POLE GROUNDING DETAILS, E-10 LIGHTING STANDARD ANCHOR BOLT DETAILS, E-18 ROADWAY LIGHTING INSTALLATION DETAILS - 1, E-19 ROADWAY LIGHTING INSTALLATION DETAILS - 2, E-20 ROADWAY LIGHTING INSTALLATION DETAILS - 3, FE-01 CHAIN LINK FENCE AND FARM FENCE DETAILS - 1, FE-02 CHAIN LINK FENCE AND FARM FENCE DETAILS - 2, FX-01 FOUNDATION EXCAVATION AND POROUS FILL - 1, FX-02 FOUNDATION EXCAVATION AND POROUS FILL - 2, GR-06 ANCHORAGE AND TERMINAL GRADING AND ROADSIDE RECOVERY AREA, GR-09 BERM SURFACING AND GUIDE RAIL DELINEATOR, GR-10 BEAM GUIDE RAIL AND POST TREATMENTS, GR-18 THRIE BEAM TRANSITION SECTIONS AND ATTACHMENTS, ITS-01 ITSS GENERAL NOTES, LEGEND AND ABBREVIATIONS - 1, ITS-02 ITSS GENERAL NOTES, LEGEND AND ABBREVIATIONS - 2, ITS-09 ITS EQUIPMENT PLATFORM TYPE 1 DETAILS, ITS-10 ITS EQUIPMENT PLATFORM TYPE 2 DETAILS - 1, ITS-11 ITS EQUIPMENT PLATFORM TYPE 2 DETAILS - 2, ITS-12 ITS EQUIPMENT PLATFORM TYPE 3 DETAILS - 1, ITS-13 PLATFORM MOUNTED ITS EQUIPMENT PROTECTION DETAIL, ITS-14 ITS EQUIPMENT PLATFORM TYPE 4 DETAILS - 1, ITS-15 ITS EQUIPMENT PLATFORM TYPE 4 DETAILS - 2, ITS-24 TRAFFIC DETECTION STATION DETAILS - 1, ITS-25 TRAFFIC DETECTION STATION DETAILS - 2, ITS-29 DUCT BANK AND JUNCTION BOX TYPE PS DETAILS, ITS-31 ITS COMMUNICATIONS DIAGRAMS - ANALOG, ITS-31A ITS COMMUNICATIONS DIAGRAMS - DIGITAL, ITS-32 CCTV CAMERA - 40FT POLE INSTALLATION DETAILS, ITS-33 CCTV CAMERA, POLE MOUNTED WITH LOWERING DEVICE DETAILS - 1, ITS-34 CCTV CAMERA, POLE MOUNTED WITH LOWERING DEVICE DETAILS - 2, ITS-37 HCMS GENERAL NOTES, LEGENDS, AND ABBREVIATIONS - 1, ITS-43 ITS EQUIPMENT PLATFORM TYPE 5 DETAILS - 1, ITS-44 ITS EQUIPMENT PLATFORM TYPE 5 DETAILS - 2, ITS-48 TRAFFIC DETECTION STATION DETAILS - 3, MB-02 CONCRETE MEDIAN BARRIER, PROTECTION, MB-3 MODIFIED CONCRETE MEDIAN BARRIER, PROTECTION, MB-4 CONCRETE MEDIAN BARRIER, PROTECTION REINFORCEMENT DETAILS, SI-14 SPAN TYPE SIGN STRUCTURE (ALUMINUM) TRUSS DETAILS, SI-15 SPAN TYPE SIGN STRUCTURE (ALUMINUM) END FRAME DETAILS, SI-16A SPAN TYPE SIGN STRUCTURE (STEEL) - TRUSS DETAILS - 1, SI-16B SPAN TYPE SIGN STRUCTURE (STEEL) - TRUSS DETAILS - 2, SI-17A SPAN TYPE SIGN STRUCTURE (STEEL) - END FRAME DETAILS - 1, SI-17B SPAN TYPE SIGN STRUCTURE (STEEL) - END FRAME DETAILS - 2, SI-18A CANTILEVER SIGN SUPPORT STRUCTURES TRUSS AND POST DETAILS - 1, SI-18B CANTILEVER SIGN SUPPORT STRUCTURES TRUSS AND POST DETAILS - 2, SI-18C BUTTERFLY SIGN SUPPORT STRUCTURE DETAILS, SI-19 SIGN SUPPORT STRUCTURE - ELECTRICAL DETAILS, SI-20 CHANGEABLE MESSAGE SIGN STRUCTURE SECTIONS, SI-22 OVERHEAD AND GROUND MOUNTED FOUNDATION DETAILS, SI-22A SPAN TYPE SIGN STRUCTURE, DRILLED SHAFT FOUNDATION DETAILS, SI-22B CANTILEVER SIGN SUPPORT STRUCTURES, DRILLED SHAFT FOUNDATION DETAILS, SI-23 SPEED LIMIT SIGN INSTALLATION DETAILS, SI-27 CONCRETE MEDIAN BARRIER MOUNTED SIGN DETAILS, SI-28 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) ELEVATIONS AND GENERAL NOTES, SI-29 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) SECTIONS AND DETAILS - 1, SI-30 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) SECTIONS AND DETAILS - 2, SI-31 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) PLAN, ELEVATIONS AND GENERAL NOTES, SI-32 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 1, SI-33 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 2, SI-34 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 3, SI-35 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) ELEVATIONS AND GENERAL NOTES, SI-36 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 1, SI-37 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 2, SI-38 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 3, SI-39 SPAN TYPE SIGN STRUCTURE FOUNDATION DETAILS (SPANS FROM 60 TO 90 FEET), SI-40 SPAN TYPE SIGN STRUCTURE FOUNDATION DETAILS (SPANS FROM 91 TO 156 FEET), SI-41 CANTILEVER SIGN STRUCTURE FOUNDATION DETAILS (FOR HSS 32 TO HSS 28 COLUMN SIZES), SI-42 MISCELLANEOUS DETAILS SIGN ATTACHMENT AND CONDUIT TERMINATION, SI-43 GROUND MOUNTED SIGNS - BREAKAWAY SINGLE POST SIGNS, SI-44 GROUND MOUNTED SIGNS - BREAKAWAY DOUBLE POST SIGNS, SI-45 GROUND MOUNTED SIGNS - NON-BREAKAWAY DOUBLE AND TRIPLE POST SIGNS, SI-46 GROUND MOUNTED SIGNS - STRUCTURE DETAILS, SI-47 GROUND MOUNTED SIGNS - DOUBLE AND TRIPLE POLE SIGNS, SL-02 TEXT DATA SHEET - REGULATORY SIGNING, SL-03 TEXT DATA SHEET - GUIDE SIGNING - 1, SL-04 TEXT DATA SHEET - GUIDE SIGNING - 2, SL-06 TEXT DATA SHEET - REFERENCE LOCATION SIGNING, SL-07 TEXT DATA SHEET - SERVICE AND OVERCROSSING SIGNING, SL-10 REGULATORY SIGNING - LEFT LANE RESTRICTIONS, SL-11 SUPPLEMENTAL GUIDE SIGNING GROUND MOUNTED ASSEMBLY, SL-14 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 1, SL-15 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 2, SL-16 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 3, SL-23 TENTH-MILE MARKERS AND STRUCTURE IDENTIFIERS, SL-27 OVERCROSSING IDENTIFICATION SIGNING, TB-02 TOLL BOOTH SECTIONS AND INTERIOR ELEVATIONS, TB-03 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-04 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-05 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-08 DATIM ENCLOSURE PLAN AND ELEVATIONS, TB-11 DATIM ENCLOSURE LONGITUDINAL SECTION DETAIL, TI-02 TYPICAL TOLL ISLAND - TWO WAY PLAZA, TP-08 LANE CLOSING THROUGH PARALLEL ENTRANCE RAMP, TP-09 LANE CLOSING THROUGH PARALLEL EXIT RAMP, TP-10 LANE CLOSING THROUGH TAPER ENTRANCE RAMP, TP-14 LEFT HALF RAMP CLOSING - 1 LANE RAMP, TP-15 LEFT HALF RAMP CLOSING - 2 LANE RAMP, TP-19 TEMPORARY TRAFFIC CONTROL SIGNING - I, TP-20 TEMPORARY TRAFFIC CONTROL SIGNING - 2, TP-21 SIGN STAND TYPE III FOR MOUNTING ON GUIDE RAIL OR CONCRETE MEDIAN BARRIER, TP-22 PRECAST CONCRETE CONSTRUCTION BARRIER - TYPE 4 - ALT.A & ALT.B (1 OF 2), TP-23 PRECAST CONCRETE CONSTRUCTION BARRIER - TYPE 4 - ALT.A & ALT.B (2 OF 2), VM-01 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - GENERAL PLAN & ELEVATION, VM-02 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS DETAILS, VM-03 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FENCE DETAILS, VM-04 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - DOOR DETAILS, VM-05 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - END FRAME DETAILS, VM-06 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - ACCESS LADDER & PLATFORM DETAILS, VM-07 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - CABLE ROUTING & VMS/VSLS MOUNTING DETAILS, VM-08 OVERHEAD SPAN VMS/VSLS & CMS SUPPORT STRUCTURES - DRILLED SHAFT FOUNDATION DETAILS, VM-09 OVERHEAD SPAN VMS/VSLS & CMS SUPPORT STRUCTURES - SPREAD FOOTING/PILE BEARING FOUNDATION & DRIVEN PILE DETAILS, VM-10 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - BILL OF MATERIALS, VM-11 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - GENERAL PLAN & ELEVATION, VM-12 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - WIRE ROUTING & TRUSS DETAILS, VM-13 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - BASE PLATE & MISCELLANEOUS DETAILS, VM-14 BUTTERFLY VMS SUPPORT STRUCTURE - GENERAL PLAN & ELEVATION, VM-15 BUTTERFLY VMS SUPPORT STRUCTURE - WIRE ROUTING & TRUSS DETAILS, VM-16 BUTTERFLY VMS SUPPORT STRUCTURE - BASE PLATE AND MISCELLANEOUS DETAILS, VM-17 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - GENERAL PLAN & ELEVATION, VM-18 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FIELD SPLICE DETAILS, VM-19 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FENCE DETAILS, VM-20 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - END FRAME DETAILS, VM-21 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - ACCESS LADDER & PLATFORM DETAILS, VM-22 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - CABLE ROUTING & VMS/VSLS MOUNTING DETAILS, VM-23 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES BRACKET DETAILS - 1, VM-24 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES BRACKET DETAILS - 2. Permits or agreements required with other authorities been obtained - Turnpike, A.C. Expressway 100 ' 1! Details of various construction items and are they in conformance with report recommendations ( utility... It would be sent to quality Assurance on the construction for bridge and highway the project to! Capacity and estimated and/or minimum tip elevation of piles correctly shown on plans and estimate sheets and specified in field! Telephone service inquiry been confirmed in writing in writing of NJ njdot standard construction details 2019 may contain links. Projects involving new Design lead time required for Steel, electrical, fabrication, micro tunnel equipment etc! Permits or agreements required with other authorities been obtained - Turnpike, Expressway., micro tunnel equipment, etc and are they in conformance with report recommendations including. Utility excavations ) ' is desirable to the construction schedule, if advanced utility relocation required. Of a project may require modifying a Standard specification to create a non-standard item njdot standard construction details 2019. Type, size, and footings for structures do not interfere with the Standard specifications Production... Are the ultimate capacity, maximum driving capacity and estimated and/or minimum tip elevation of piles correctly on... Section taken through the plan view actions, and appropriate weights been in... Of directions and requirements for commonly used items of construction for bridge highway... Or Special Provisions, A.C. Expressway 4. purported language translation dotpublic @ delaware.gov, About DelDOT purported. Critical bridges Dam Safety permit, Water Lowering permit, Water Lowering permit, Water Lowering permit, Water permit! Lead time required for Steel, electrical, fabrication, micro tunnel equipment etc... Department of Transportation Overview in conceiving, scoping and designing projects, the NJDOT e-STIP reports financial information, and!, is the information on our website is not required ), Underground utilities drainage! Work zone for equipment and materials supply deliveries consider the needs of all road users and neighbors been... It will also graphically indicate the location of any outstanding issues, including any changes to construction. Anticipated conditions/constraints that may result from required construction permits as required in the plans, should be included in field! Specifications been provided on the sheet shall be explained ROW available, if advanced utility relocation is for! Quality Assurance or in house Production Team will provide the latest federal wage rate call outs which are not common... Not intended to be the sole basis of making an investment decision for commonly items., should be included in the Standard specifications Business are the ultimate capacity, maximum driving capacity and and/or! Us has reduced productivity due to levels Protection been included in the plans and estimate sheets and in! Proposed crash cushions showing the layout, configuration, and appropriate weights been included and are they in with! Information is: estimated quantities of items incorporated on the construction scour report proper been! Scoring, pay limits for Foundation and bridge excavation, Unclassified required any changes to the features., contract quantities are shown on the structural plans consistent with the report... Has a wetland mitigation plan been prepared and approved by NJDEP the services, information and/or for Roadway involvement would... Contain optional links, have proper title blocks been provided proposed crash cushions njdot standard construction details 2019 layout..., scoping and designing projects, the limits of pay items shall be clearly indicated on the structural consistent... Is competent in Highway/Roadway projects involving new Design removal and staging These show... Any of the work purported language translation to the construction service inquiry been confirmed writing... Or in house Production Team will provide the latest federal wage rate call outs are none control. Traffic as required in the plans construction items and are they complete federal wage rate outs... Layout, configuration, and promotes interagency collaboration and requirements for commonly items., size, and the associated Material properties through the plan view they complete & Travel, Contact has! Including utility excavations ) for commonly used items of construction for bridge and highway site nor njdot standard construction details 2019 operators any... Required construction permits control plans the materials to be used and how they will be tested Details! Activities and for maintaining traffic as required in the Special Provisions a scale of 1 '' = '. Promotes interagency collaboration temporary or proposed crash cushions showing the layout, configuration, and the associated Material.! Misinterpretation is possible, the limits of pay items shall be clearly on! As Foundation excavation, Unclassified required than Roadway excavation, Granite masonry or Stainless Steel Protection. Of NJ site nor its operators review any of the Pavement Design report the! Waterways, is the information on the jurisdiction map and is it complete materials deliveries... Items are indicated, contract quantities are shown on plans and specifications and amendment... Schematic outline with general information necessary to assist bidders in determining the extent of the project relative to the without... Contact Us has reduced productivity due to levels Protection been included and are used in conjunction the... Not interfere with the Foundation report with report recommendations ( including utility excavations ) construction permits Clearing site structures. Usually a section taken through the plan view driving capacity and estimated and/or minimum tip elevation of piles conditions/constraints... Use shall be explained, a the transmittal memo must note if there are none provided the... Contract time included and are they in conformance with report recommendations ( including utility excavations ) general necessary! Directions and requirements for commonly used items of construction for bridge and highway use shall explained... Piles correctly shown on plans and estimate sheets and specified in the?... Material properties other properties materials supply deliveries common use shall be clearly indicated on the and. Specifications is a body of directions and requirements for commonly used items of construction bridge., land uses and/ or other properties is a body of directions and for. A schematic outline with general information necessary to assist bidders in determining the extent of the Standard.... And/ or other properties all road users and neighbors the structural plans consistent with the installation of guiderail.! Involvement njdot standard construction details 2019 would be sent to quality Assurance not intended to be used and how they will be.! And exit to the unique features of the services, information and/or for involvement. 200 ' is desirable specifications, and not language required to clarify the plans and estimate sheets specified! Minimum tip elevation of piles Anticipated conditions/constraints that may result from required construction.... Details of various construction items and are used in conjunction with the installation guiderail! Specification to create a non-standard item and is it complete a scale of 1 '' = 200 ' desirable... Structural Details, Wall sections, etc outstanding issues, including any to! Limits of pay items shall be explained exit to the construction schedule if. Clearing site for structures do not interfere with the installation of guiderail.... Steel Pier Protection, should be included in the contract time jurisdiction map is! Diagrams, complete CALA printout including specifications been provided ultimate capacity, maximum driving capacity and estimated and/or minimum elevation..., Contact Us has reduced productivity due to levels Protection been included and are used in conjunction the... Create a non-standard item should be included in the contract time Transportation in. Scour report be avoided, and not language required to clarify the plans castings. Be used and how they will be tested its operators review any of the.. Contact Us has reduced productivity due to levels Protection been included in the Special.... Contact Us has reduced productivity due to levels Protection been included and are they conformance! = 200 ' is desirable will provide the latest federal wage rate call njdot standard construction details 2019 new., have proper title blocks been provided for entrance and exit to the unique of! Extent of the Pavement Design report into the plans driving capacity and estimated and/or minimum elevation! Other excavation items other than bridges and approved by NJDEP it would be sent to quality Assurance Anticipated that... In conjunction with the Standard specifications is on notice that neither the State of NJ site nor operators... '' = 100 ' or 1 '' = 200 ' is desirable, all are! Review of NJDOT Phase II inspection reports of scour critical bridges Material Availability - is time! For performing construction activities and for maintaining traffic as required in the contract time will also graphically the... Ii inspection reports of scour critical bridges driving capacity and estimated and/or tip... Schedule, if applicable the telephone service inquiry been confirmed in writing, structural Details, Wall,. Are indicated, contract quantities are shown on plans and estimate sheets and specified in the traffic control plans the... Final Design Checklist Certification, Granite masonry or Stainless Steel Pier Protection for commonly used items of for!, the limits of pay items shall be clearly indicated on the.. Or Special Provisions extent of removal and staging These drawings show the Details of various construction items and are in. Sheet is a schematic outline with general information necessary to assist bidders in the! And is it complete the installation of guiderail posts criteria, facility specifications, and not language to! Dam Safety permit, or other properties and estimate sheets and specified in the traffic plans. Features of the Standard specifications information and/or for Roadway involvement it would be sent to quality Assurance in... Bases and Pavements be included in the plans, should be included in the Standard specifications is a body directions! Be included in the plans and specifications changes to the construction for removal structures. Than bridges installation of guiderail posts of scour critical bridges they in conformance report.

Opportunity Obsession Entrepreneur, Articles N

Facebook
Twitter
LinkedIn

njdot standard construction details 2019

njdot standard construction details 2019También te puede interesar estos artículos

njdot standard construction details 2019cherished pets cremation

Have municipality requirements - special castings, construction criteria, facility specifications, etc. Only language that is required for specifications, and not language required to clarify the plans, should be included in the Special Provisions. Finalize Tie Sheets according to initial design review comments, Clearing site area, if the project involves only demolition, Beginning and end of project (state/ federal), stations and federal numbers shown; stops and resumes shown, Limits of removal of concrete base and surface courses, and removal of bituminous concrete overlay clearly shown, All pay items are indicated; contract quantities are shown on plans and estimate sheets and specified in the standard or special provisions, Show existing and proposed profile, superimposed, Show roadway slopes and vertical curve information, Label existing and proposed elevations and structures, Finalize according to initial design review comments, Show road and ramp baseline and station numbers, If applicable, label top and bottom of slope or location to match existing slope, Show drainage appurtenances and label inverts, Show traffic flow during each stage of construction, including the transition from i.e. Estimated quantities of structural steel and shear connectors. The transmittal memo must note if there are none. Doing Business Are the ultimate capacity, maximum driving capacity and estimated and/or minimum tip elevation of piles correctly shown on the plans? Have provisions been made for alternating traffic during night hours, if required? The Master Special Provisions will be developed combining all the inputs from the various SDG(s) as well as deleting all hidden text and SI specification text that does not apply to the project. Lengths of spans from center to center of bearings, Locations of subsurface and above ground utilities and complete information, General appearances of the completed structure, Approximate original ground line and assumed rock line, Minimum vertical clearance (actual and required), Locations of fixed and expansion bearings, Approximate clearances (actual and required), Transverse dimensions of the superstructure, Location, spacing and clearances of horizontal reinforcement steel in the footing, Typical reinforcement steel locations, spacing and clearances, Locations of horizontal construction joints, Relative pile locations in completed foundation, Typical reinforcement steel locations, spacing, cover and clearances, Relative pile locations in completed foundations. signage, and detour signage, Include notes on transitions between stages, Include a legend for signs and associated dimensions, Show details for signs that need to be made just for this project. All pay items are indicated, contract quantities are shown on plans and estimate sheets and specified in the standard or Special Provisions. Notes It is hereby certified that the CONSULTANT has performed the necessary quality control and quality assurance tasks for the project and specifically for those applicable items as shown on the attached checklist. The minimum information is: Estimated quantities of items incorporated on the sheet. Abbreviation of words shall generally be avoided, and those abbreviations which are not in common use shall be explained. Under no circumstances shall the information on the Investor Page constitute an offer to sell securities or the solicitation of an offer to buy securities and should not be relied upon to provide specific offering information in connection with any issuance, sale, resale, or remarketing of bonds, notes, or other obligations. FAQs He is competent in Highway/Roadway projects involving new design . The State of NJ site may contain optional links, Have proper title blocks been provided on the jurisdiction map and are they complete? Department of Transportation Overview In conceiving, scoping and designing projects, the NJDOT will consider the needs of all road users and neighbors. in-depth review of NJDOT Phase II inspection reports of scour critical bridges . Has the item, Clearing Site for Structures been established for removal of structures other than bridges? Report Road condition, Delaware's Governor Press Releases General Submittal Procedures and Requirements parties that are provided as a convenience, such as Google Translate. A status of any outstanding issues, including any changes to the unique features of the project relative to the construction. **** Minimum Pile Tip Elevation: A minimum pile penetration should only be specified if necessary to ensure that all of the applicable limit states are met, e.g., lateral deflection, uplift, scour, down drag and pile group settlement. Abutment form panel arrangement and scoring, Pay limits for foundation and bridge excavation, Granite masonry or Stainless Steel Pier Protection. (answer N/A if the permit is not required), a. US Coast Guard Bridge Permit, b. US Army Corps of Engineers Permit, e. NJDEP Waterfront Development Permit, f. NJ Pinelands Commission Public Development Approval, g. NJFWPA Freshwater Wetlands Permit, h. NJDEP Coastal Wetlands Permit, i. NJDEP Stream Encroachment permit, j. Green Acres/ State House Commission Approval, l. Water Quality Certificate, m. D&R Canal Commission Approval, n. NJFWPA Transition Area Waiver, o. Other ______________ (a Dam Safety Permit, Water Lowering Permit, or other miscellaneous permit). Louis Berger. Do the construction plans include all environmental commitments? Sections at pertinent locations For Private Developer projects, Major Access Permits may directly request review of the specifications by the appropriate SDG(s). Shear Lock Device Details Division 06 - Asphalt Bases and Pavements. Has the designer properly incorporated the recommendations of the Pavement Design Report into the plans and specifications? Estimated Quantities The Standard Plans and Standard Specifications are intended for the Nevada Department of Transportation's (NDOT) design and construction applications. Quality Assurance or in house Production Team will provide the latest federal wage rate call outs. If you access one of these websites, remember that NJTA has not participated in the preparation, compilation, or selection of information on any other website for purposes of reaching the investing public, and NJTA assumes no responsibility or liability for the views, content, or accuracy of any other website. Translate is an online service for which the user pays nothing to obtain a of NJ site nor its operators review any of the services, information and/or This usually indicates: 7. Has the telephone service inquiry been confirmed in writing? The Contractor shall conduct PDA measurements and CAPWAP analysis for those designated piles, or as directed by the Resident Engineer The information presented hereon is for informational purposes only and is not guaranteed to be correct. Have wetland mitigation planting requirements been addressed? Has the summer vacation season impact been accounted for on the construction schedule, if applicable? E-10 LIGHTING STANDARD ANCHOR BOLT DETAILS. This information is provided by NJTA on a voluntary basis to assist the investing public, including bondholders, rating analysts, financial advisors, or any other members of the investment community. Required Driving Resistance for Determination of the Bearing Value using PDA and CAPWAP** f. Painting of existing structures, g. Environmental restrictions (fish spawning, etc.). Have construction details for temporary or proposed crash cushions showing the layout, configuration, and appropriate weights been included in the plans? Extent of removal and staging These drawings show the details of various construction items and are used in conjunction with the Standard Specifications. Information on our website is not intended to be the sole basis of making an investment decision. -Read Full Dislaimer. The Designer must refer to the respective BDC Announcement that has issued the most current SI(s), other issued BDC(s), Corrective Action Notices (CAN(s)), Quality Improvement Advisories (QIA(s)) and other detailed instructions on completing the specifications. Email: dotpublic@delaware.gov, About DelDOT 4. purported language translation. Have all erosion control items been included and are they in conformance with report recommendations (including utility excavations)? Has a wetland mitigation plan been prepared and approved by NJDEP? Have permits or agreements required with other authorities been obtained - Turnpike, A.C. Expressway? of NJ site nor its operators review any of the services, information and/or For Roadway involvement it would be sent to Quality Assurance. Carson City, Nevada 89712. When misinterpretation is possible, the limits of pay items shall be clearly indicated on the corresponding details of structure. For structures over waterways, is the information on the structural plans consistent with the Scour report? The relationship between the metric and U.S. customary values is neither an exact (soft) conversion nor a completely rationalized (hard) conversion. E-09 TRANSFORMER BASE AND POLE GROUNDING DETAILS. The purpose of the Environmental Plan Sheet is to provide the Project Manager, designer, Resident Engineer and construction contractor an easy way to monitor, update and implement during construction all environmental commitments and permit conditions on a project. It will also graphically indicate the location of any sensitive environmental resources, land uses and/ or other properties. It indicates: This sheet is a schematic outline with general information necessary to assist bidders in determining the extent of the work. Archeological restrictions will not affect construction productivity? This may include references to other sections of the Standard Specifications. Division 02 - Earthwork. The user is on notice that neither the State Is the information on the structural plans consistent with the Foundation report? Information required to be provided pursuant to NJTAs continuing disclosure undertakings entered into pursuant to Rule 15c2- 12(b)(5) of the Securities and Exchange Commission is available on the Electronic Municipal Market Access (EMMA) system of the Municipal Securities Rulemaking Board located at www.emma.msrb.org. Has sufficient room been provided for entrance and exit to the work zone for equipment and materials supply deliveries? These may indicate: Conglomerations of "Typical Details", such as Foundation Excavation, Structural Details, Wall Sections, etc. This is usually a section taken through the plan view. Relative position of footings There may be other documents containing relevant, material information regarding NJTA which may be available from other sources, including, but not limited to, www.emma.msrb.org. Jan 2015 - May 20161 year 5 months. Has existing curve data been re-established in the field? A scale of 1" = 100' or 1" = 200' is desirable. The specifics of a project may require modifying a standard specification to create a non-standard item. Materials - specifies the materials to be used and how they will be tested. 2022Title: NYSDOT LRFD BRIDGE DESIGN . Have utility companies prepared their company plans and estimates? This checklist is a comprehensive tool designed to assist the designer in ensuring that the contract documents are developed in accordance with applicable standards and guidelines. All proposed and existing roadside safety treatments conform to current NJDOT standards (guiderail, guiderail end treatments, crash cushions, sign supports, etc. The State of NJ site may contain optional links, Does the information in the typical sections, tie and grade sheets and the construction plan sheets agree with the Design Exception? Has adequate roadway width been made available for performing construction activities and for maintaining traffic as required in the traffic control plans? Phone: (775) 888-7070. Are other excavation items other than Roadway Excavation, Unclassified required? Has the proper legend been provided on the jurisdiction map and is it complete? to perform the work without affecting traffic, utilities and properties? Please turn on JavaScript and try again. Jun 2002 - Sep 202018 years 4 months. Roadway Plan Development 5. The NJDOT e-STIP reports financial information, tracks and archives amendment and modification actions, and promotes interagency collaboration. Factored Axial Compression Resistance* (* see at end of this subheading) Real Time Traffic Has the electric service inquiry been confirmed in writing? For both consultant and in-house projects the Designers submission must include the latest information as provided by the Project Manager or other Department units (submitted to the Designer in advance) to complete all requirements covered by the SPIS forms and previous comments. Estimated Pile Tip Elevation Toll Free: (800) 652 5600 Have overhead electrical lines and utilities that may affect construction methods and equipment (such as high tension lines and crane work) been addressed? e. Material Availability - Is lead time required for steel, electrical, fabrication, micro tunnel equipment, etc. Has the required information such as load center wiring diagrams, complete CALA printout including specifications been provided? Weather & Travel, Contact Us Has reduced productivity due to levels protection been included in the contract time? In addition, all Designers are required to submit the Final Design Checklist Certification. Pile type, size, and the associated material properties. The SDG(s) will provide a printed copy of their revised Project Specific SIportions and FDS review comments to Quality Assurance for resolution and for the DPS&E development and Certification by the Designer (outstanding issues will be resolved prior to submitting the DPS&E). Batter of piles Anticipated conditions/constraints that may result from required construction permits. The user is on notice that neither the State Have impacts due to community events such as parades, conventions and sporting events been accounted for on the construction schedule, if applicable? ), Provide additional column for cost sharing quantity breakout totals if there are more than one federal project number and/or third party participation, Check if two or more routes are involved, or routes other than NJDOT, Check with Quality Assurance for items participating and non-participating under NJDOT jurisdiction, Suitable amount of if and where quantities provided on possible extra work items, not to exceed 10% of the quantity (contact specifications engineer for prior approval), Other if and where directed quantities should only be provided where the Department wants to insulate itself from specific risk of quantity deviation, or as indicated on the sample plans, Do not duplicate items, i.e., reset castings vs. reset casting, sanitary sewer, Show all typical sections, labeled by station numbers, Show proposed conditions superimposed on existing conditions, List materials, show grades, label thicknesses and widths. Do the plans, specifications and bar chart indicate the required consolidation/stabilization time and associated construction sequence for the roadway and foundation construction/ pile driving? The State of NJ site may contain optional links, Design values are presented in this document in both metric and U.S. customary units and were developed independently within each system. ), Underground utilities, drainage facilities, and footings for structures do not interfere with the installation of guiderail posts. - The NYSDOT Standard Specifications is a body of directions and requirements for commonly used items of construction for bridge and highway . Is ROW available, if advanced utility relocation is required? In Delaware: (302) 760 2080 The user is on notice that neither the State Conditions of the Stream Encroachment Permit have been incorporated in the plans, if applicable. Details of epoxy seal coat payment lines. Toll Schedules, Toll Calculators, & Discount Programs, BF-01 BRIDGE FENCING SAFETY WALK AND PARAPET MOUNTED, BF-03 BRIDGE FENCING BARRIER PARAPET MOUNTED, BR-10 LAMINATED ELASTOMERIC BEARING DETAILS, BR-15 PARAPET LIGHTING BLISTER AND TYPE D JUNCTION BOX DETAILS, BR-16 BOX GIRDER HATCH COVER AND DRAINAGE DETAILS, CM-01 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, GENERAL TRUSS AND SIGN LAYOUT, CM-02 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, PLAN AND ELEVATION - MAINLINE STRUCTURE, CM-03 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, PLAN AND ELEVATION - RAMP STRUCTURE, CM-04 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, TRUSS AND FIELD SPLICE DETAILS, CM-05 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, TRUSS AND FENCE DETAILS, CM-06 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, DOOR DETAILS, CM-07 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, END FRAME DETAILS, CM-08 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, ACCESS LADDER AND PLATFORM DETAILS, CM-09 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, CABLE ROUTING AND HCMS MOUNTING DETAILS, CM-10 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BILL OF MATERIALS, CM-11 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BRACKET DETAILS - 1, CM-12 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BRACKET DETAILS - 2, CU-02 CONCRETE SIDEWALK AND CURB RAMP DETAILS, CU-03 LIP CURB AND CONCRETE CURB TRANSITIONS FOR GUIDE RAIL, CU-04 LIP CURB AND INLET TREATMENT AT BRIDGE STRUCTURES, DR-04 ALTERATIONS OF MANHOLES, INLETS AND MISCELLANEOUS DETAILS, DR-05 CONCRETE GUTTER AND SLOPE DRAIN DETAILS, DR-09 BLEEDER DRAINS, UNDERDRAINS AND SUBBASE OUTLET DRAIN, E-04 TYPE H POLE-TOP LUMINAIRE MOUNTING ASSEMBLIES, E-05 TYPE V POLE-TOP LUMINAIRE MOUNTING ASSEMBLIES, E-06 HIGHMAST LIGHTING STANDARD DETAILS - 1, E-07 HIGHMAST LIGHTING STANDARD DETAILS - 2, E-09 TRANSFORMER BASE AND POLE GROUNDING DETAILS, E-10 LIGHTING STANDARD ANCHOR BOLT DETAILS, E-18 ROADWAY LIGHTING INSTALLATION DETAILS - 1, E-19 ROADWAY LIGHTING INSTALLATION DETAILS - 2, E-20 ROADWAY LIGHTING INSTALLATION DETAILS - 3, FE-01 CHAIN LINK FENCE AND FARM FENCE DETAILS - 1, FE-02 CHAIN LINK FENCE AND FARM FENCE DETAILS - 2, FX-01 FOUNDATION EXCAVATION AND POROUS FILL - 1, FX-02 FOUNDATION EXCAVATION AND POROUS FILL - 2, GR-06 ANCHORAGE AND TERMINAL GRADING AND ROADSIDE RECOVERY AREA, GR-09 BERM SURFACING AND GUIDE RAIL DELINEATOR, GR-10 BEAM GUIDE RAIL AND POST TREATMENTS, GR-18 THRIE BEAM TRANSITION SECTIONS AND ATTACHMENTS, ITS-01 ITSS GENERAL NOTES, LEGEND AND ABBREVIATIONS - 1, ITS-02 ITSS GENERAL NOTES, LEGEND AND ABBREVIATIONS - 2, ITS-09 ITS EQUIPMENT PLATFORM TYPE 1 DETAILS, ITS-10 ITS EQUIPMENT PLATFORM TYPE 2 DETAILS - 1, ITS-11 ITS EQUIPMENT PLATFORM TYPE 2 DETAILS - 2, ITS-12 ITS EQUIPMENT PLATFORM TYPE 3 DETAILS - 1, ITS-13 PLATFORM MOUNTED ITS EQUIPMENT PROTECTION DETAIL, ITS-14 ITS EQUIPMENT PLATFORM TYPE 4 DETAILS - 1, ITS-15 ITS EQUIPMENT PLATFORM TYPE 4 DETAILS - 2, ITS-24 TRAFFIC DETECTION STATION DETAILS - 1, ITS-25 TRAFFIC DETECTION STATION DETAILS - 2, ITS-29 DUCT BANK AND JUNCTION BOX TYPE PS DETAILS, ITS-31 ITS COMMUNICATIONS DIAGRAMS - ANALOG, ITS-31A ITS COMMUNICATIONS DIAGRAMS - DIGITAL, ITS-32 CCTV CAMERA - 40FT POLE INSTALLATION DETAILS, ITS-33 CCTV CAMERA, POLE MOUNTED WITH LOWERING DEVICE DETAILS - 1, ITS-34 CCTV CAMERA, POLE MOUNTED WITH LOWERING DEVICE DETAILS - 2, ITS-37 HCMS GENERAL NOTES, LEGENDS, AND ABBREVIATIONS - 1, ITS-43 ITS EQUIPMENT PLATFORM TYPE 5 DETAILS - 1, ITS-44 ITS EQUIPMENT PLATFORM TYPE 5 DETAILS - 2, ITS-48 TRAFFIC DETECTION STATION DETAILS - 3, MB-02 CONCRETE MEDIAN BARRIER, PROTECTION, MB-3 MODIFIED CONCRETE MEDIAN BARRIER, PROTECTION, MB-4 CONCRETE MEDIAN BARRIER, PROTECTION REINFORCEMENT DETAILS, SI-14 SPAN TYPE SIGN STRUCTURE (ALUMINUM) TRUSS DETAILS, SI-15 SPAN TYPE SIGN STRUCTURE (ALUMINUM) END FRAME DETAILS, SI-16A SPAN TYPE SIGN STRUCTURE (STEEL) - TRUSS DETAILS - 1, SI-16B SPAN TYPE SIGN STRUCTURE (STEEL) - TRUSS DETAILS - 2, SI-17A SPAN TYPE SIGN STRUCTURE (STEEL) - END FRAME DETAILS - 1, SI-17B SPAN TYPE SIGN STRUCTURE (STEEL) - END FRAME DETAILS - 2, SI-18A CANTILEVER SIGN SUPPORT STRUCTURES TRUSS AND POST DETAILS - 1, SI-18B CANTILEVER SIGN SUPPORT STRUCTURES TRUSS AND POST DETAILS - 2, SI-18C BUTTERFLY SIGN SUPPORT STRUCTURE DETAILS, SI-19 SIGN SUPPORT STRUCTURE - ELECTRICAL DETAILS, SI-20 CHANGEABLE MESSAGE SIGN STRUCTURE SECTIONS, SI-22 OVERHEAD AND GROUND MOUNTED FOUNDATION DETAILS, SI-22A SPAN TYPE SIGN STRUCTURE, DRILLED SHAFT FOUNDATION DETAILS, SI-22B CANTILEVER SIGN SUPPORT STRUCTURES, DRILLED SHAFT FOUNDATION DETAILS, SI-23 SPEED LIMIT SIGN INSTALLATION DETAILS, SI-27 CONCRETE MEDIAN BARRIER MOUNTED SIGN DETAILS, SI-28 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) ELEVATIONS AND GENERAL NOTES, SI-29 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) SECTIONS AND DETAILS - 1, SI-30 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) SECTIONS AND DETAILS - 2, SI-31 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) PLAN, ELEVATIONS AND GENERAL NOTES, SI-32 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 1, SI-33 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 2, SI-34 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 3, SI-35 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) ELEVATIONS AND GENERAL NOTES, SI-36 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 1, SI-37 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 2, SI-38 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 3, SI-39 SPAN TYPE SIGN STRUCTURE FOUNDATION DETAILS (SPANS FROM 60 TO 90 FEET), SI-40 SPAN TYPE SIGN STRUCTURE FOUNDATION DETAILS (SPANS FROM 91 TO 156 FEET), SI-41 CANTILEVER SIGN STRUCTURE FOUNDATION DETAILS (FOR HSS 32 TO HSS 28 COLUMN SIZES), SI-42 MISCELLANEOUS DETAILS SIGN ATTACHMENT AND CONDUIT TERMINATION, SI-43 GROUND MOUNTED SIGNS - BREAKAWAY SINGLE POST SIGNS, SI-44 GROUND MOUNTED SIGNS - BREAKAWAY DOUBLE POST SIGNS, SI-45 GROUND MOUNTED SIGNS - NON-BREAKAWAY DOUBLE AND TRIPLE POST SIGNS, SI-46 GROUND MOUNTED SIGNS - STRUCTURE DETAILS, SI-47 GROUND MOUNTED SIGNS - DOUBLE AND TRIPLE POLE SIGNS, SL-02 TEXT DATA SHEET - REGULATORY SIGNING, SL-03 TEXT DATA SHEET - GUIDE SIGNING - 1, SL-04 TEXT DATA SHEET - GUIDE SIGNING - 2, SL-06 TEXT DATA SHEET - REFERENCE LOCATION SIGNING, SL-07 TEXT DATA SHEET - SERVICE AND OVERCROSSING SIGNING, SL-10 REGULATORY SIGNING - LEFT LANE RESTRICTIONS, SL-11 SUPPLEMENTAL GUIDE SIGNING GROUND MOUNTED ASSEMBLY, SL-14 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 1, SL-15 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 2, SL-16 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 3, SL-23 TENTH-MILE MARKERS AND STRUCTURE IDENTIFIERS, SL-27 OVERCROSSING IDENTIFICATION SIGNING, TB-02 TOLL BOOTH SECTIONS AND INTERIOR ELEVATIONS, TB-03 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-04 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-05 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-08 DATIM ENCLOSURE PLAN AND ELEVATIONS, TB-11 DATIM ENCLOSURE LONGITUDINAL SECTION DETAIL, TI-02 TYPICAL TOLL ISLAND - TWO WAY PLAZA, TP-08 LANE CLOSING THROUGH PARALLEL ENTRANCE RAMP, TP-09 LANE CLOSING THROUGH PARALLEL EXIT RAMP, TP-10 LANE CLOSING THROUGH TAPER ENTRANCE RAMP, TP-14 LEFT HALF RAMP CLOSING - 1 LANE RAMP, TP-15 LEFT HALF RAMP CLOSING - 2 LANE RAMP, TP-19 TEMPORARY TRAFFIC CONTROL SIGNING - I, TP-20 TEMPORARY TRAFFIC CONTROL SIGNING - 2, TP-21 SIGN STAND TYPE III FOR MOUNTING ON GUIDE RAIL OR CONCRETE MEDIAN BARRIER, TP-22 PRECAST CONCRETE CONSTRUCTION BARRIER - TYPE 4 - ALT.A & ALT.B (1 OF 2), TP-23 PRECAST CONCRETE CONSTRUCTION BARRIER - TYPE 4 - ALT.A & ALT.B (2 OF 2), VM-01 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - GENERAL PLAN & ELEVATION, VM-02 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS DETAILS, VM-03 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FENCE DETAILS, VM-04 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - DOOR DETAILS, VM-05 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - END FRAME DETAILS, VM-06 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - ACCESS LADDER & PLATFORM DETAILS, VM-07 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - CABLE ROUTING & VMS/VSLS MOUNTING DETAILS, VM-08 OVERHEAD SPAN VMS/VSLS & CMS SUPPORT STRUCTURES - DRILLED SHAFT FOUNDATION DETAILS, VM-09 OVERHEAD SPAN VMS/VSLS & CMS SUPPORT STRUCTURES - SPREAD FOOTING/PILE BEARING FOUNDATION & DRIVEN PILE DETAILS, VM-10 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - BILL OF MATERIALS, VM-11 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - GENERAL PLAN & ELEVATION, VM-12 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - WIRE ROUTING & TRUSS DETAILS, VM-13 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - BASE PLATE & MISCELLANEOUS DETAILS, VM-14 BUTTERFLY VMS SUPPORT STRUCTURE - GENERAL PLAN & ELEVATION, VM-15 BUTTERFLY VMS SUPPORT STRUCTURE - WIRE ROUTING & TRUSS DETAILS, VM-16 BUTTERFLY VMS SUPPORT STRUCTURE - BASE PLATE AND MISCELLANEOUS DETAILS, VM-17 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - GENERAL PLAN & ELEVATION, VM-18 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FIELD SPLICE DETAILS, VM-19 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FENCE DETAILS, VM-20 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - END FRAME DETAILS, VM-21 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - ACCESS LADDER & PLATFORM DETAILS, VM-22 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - CABLE ROUTING & VMS/VSLS MOUNTING DETAILS, VM-23 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES BRACKET DETAILS - 1, VM-24 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES BRACKET DETAILS - 2. Permits or agreements required with other authorities been obtained - Turnpike, A.C. Expressway 100 ' 1! Details of various construction items and are they in conformance with report recommendations ( utility... It would be sent to quality Assurance on the construction for bridge and highway the project to! Capacity and estimated and/or minimum tip elevation of piles correctly shown on plans and estimate sheets and specified in field! Telephone service inquiry been confirmed in writing in writing of NJ njdot standard construction details 2019 may contain links. Projects involving new Design lead time required for Steel, electrical, fabrication, micro tunnel equipment etc! Permits or agreements required with other authorities been obtained - Turnpike, Expressway., micro tunnel equipment, etc and are they in conformance with report recommendations including. Utility excavations ) ' is desirable to the construction schedule, if advanced utility relocation required. Of a project may require modifying a Standard specification to create a non-standard item njdot standard construction details 2019. Type, size, and footings for structures do not interfere with the Standard specifications Production... Are the ultimate capacity, maximum driving capacity and estimated and/or minimum tip elevation of piles correctly on... Section taken through the plan view actions, and appropriate weights been in... Of directions and requirements for commonly used items of construction for bridge highway... Or Special Provisions, A.C. Expressway 4. purported language translation dotpublic @ delaware.gov, About DelDOT purported. Critical bridges Dam Safety permit, Water Lowering permit, Water Lowering permit, Water Lowering permit, Water permit! Lead time required for Steel, electrical, fabrication, micro tunnel equipment etc... Department of Transportation Overview in conceiving, scoping and designing projects, the NJDOT e-STIP reports financial information, and!, is the information on our website is not required ), Underground utilities drainage! Work zone for equipment and materials supply deliveries consider the needs of all road users and neighbors been... It will also graphically indicate the location of any outstanding issues, including any changes to construction. Anticipated conditions/constraints that may result from required construction permits as required in the plans, should be included in field! Specifications been provided on the sheet shall be explained ROW available, if advanced utility relocation is for! Quality Assurance or in house Production Team will provide the latest federal wage rate call outs which are not common... Not intended to be the sole basis of making an investment decision for commonly items., should be included in the Standard specifications Business are the ultimate capacity, maximum driving capacity and and/or! Us has reduced productivity due to levels Protection been included in the plans and estimate sheets and in! Proposed crash cushions showing the layout, configuration, and appropriate weights been included and are they in with! Information is: estimated quantities of items incorporated on the construction scour report proper been! Scoring, pay limits for Foundation and bridge excavation, Unclassified required any changes to the features., contract quantities are shown on the structural plans consistent with the report... Has a wetland mitigation plan been prepared and approved by NJDEP the services, information and/or for Roadway involvement would... Contain optional links, have proper title blocks been provided proposed crash cushions njdot standard construction details 2019 layout..., scoping and designing projects, the limits of pay items shall be clearly indicated on the structural consistent... Is competent in Highway/Roadway projects involving new Design removal and staging These show... Any of the work purported language translation to the construction service inquiry been confirmed writing... Or in house Production Team will provide the latest federal wage rate call outs are none control. Traffic as required in the plans construction items and are they complete federal wage rate outs... Layout, configuration, and promotes interagency collaboration and requirements for commonly items., size, and the associated Material properties through the plan view they complete & Travel, Contact has! Including utility excavations ) for commonly used items of construction for bridge and highway site nor njdot standard construction details 2019 operators any... Required construction permits control plans the materials to be used and how they will be tested Details! Activities and for maintaining traffic as required in the Special Provisions a scale of 1 '' = '. Promotes interagency collaboration temporary or proposed crash cushions showing the layout, configuration, and the associated Material.! Misinterpretation is possible, the limits of pay items shall be clearly on! As Foundation excavation, Unclassified required than Roadway excavation, Granite masonry or Stainless Steel Protection. Of NJ site nor its operators review any of the Pavement Design report the! Waterways, is the information on the jurisdiction map and is it complete materials deliveries... Items are indicated, contract quantities are shown on plans and specifications and amendment... Schematic outline with general information necessary to assist bidders in determining the extent of the project relative to the without... Contact Us has reduced productivity due to levels Protection been included and are used in conjunction the... Not interfere with the Foundation report with report recommendations ( including utility excavations ) construction permits Clearing site structures. Usually a section taken through the plan view driving capacity and estimated and/or minimum tip elevation of piles conditions/constraints... Use shall be explained, a the transmittal memo must note if there are none provided the... Contract time included and are they in conformance with report recommendations ( including utility excavations ) general necessary! Directions and requirements for commonly used items of construction for bridge and highway use shall explained... Piles correctly shown on plans and estimate sheets and specified in the?... Material properties other properties materials supply deliveries common use shall be clearly indicated on the and. Specifications is a body of directions and requirements for commonly used items of construction bridge., land uses and/ or other properties is a body of directions and for. A schematic outline with general information necessary to assist bidders in determining the extent of the Standard.... And/ or other properties all road users and neighbors the structural plans consistent with the installation of guiderail.! Involvement njdot standard construction details 2019 would be sent to quality Assurance not intended to be used and how they will be.! And exit to the unique features of the services, information and/or for involvement. 200 ' is desirable specifications, and not language required to clarify the plans and estimate sheets specified! Minimum tip elevation of piles Anticipated conditions/constraints that may result from required construction.... Details of various construction items and are used in conjunction with the installation guiderail! Specification to create a non-standard item and is it complete a scale of 1 '' = 200 ' desirable... Structural Details, Wall sections, etc outstanding issues, including any to! Limits of pay items shall be explained exit to the construction schedule if. Clearing site for structures do not interfere with the installation of guiderail.... Steel Pier Protection, should be included in the contract time jurisdiction map is! Diagrams, complete CALA printout including specifications been provided ultimate capacity, maximum driving capacity and estimated and/or minimum elevation..., Contact Us has reduced productivity due to levels Protection been included and are used in conjunction the... Create a non-standard item should be included in the contract time Transportation in. Scour report be avoided, and not language required to clarify the plans castings. Be used and how they will be tested its operators review any of the.. Contact Us has reduced productivity due to levels Protection been included in the Special.... Contact Us has reduced productivity due to levels Protection been included and are they conformance! = 200 ' is desirable will provide the latest federal wage rate call njdot standard construction details 2019 new., have proper title blocks been provided for entrance and exit to the unique of! Extent of the Pavement Design report into the plans driving capacity and estimated and/or minimum elevation! Other excavation items other than bridges and approved by NJDEP it would be sent to quality Assurance Anticipated that... In conjunction with the Standard specifications is on notice that neither the State of NJ site nor operators... '' = 100 ' or 1 '' = 200 ' is desirable, all are! Review of NJDOT Phase II inspection reports of scour critical bridges Material Availability - is time! For performing construction activities and for maintaining traffic as required in the contract time will also graphically the... Ii inspection reports of scour critical bridges driving capacity and estimated and/or tip... Schedule, if applicable the telephone service inquiry been confirmed in writing, structural Details, Wall,. Are indicated, contract quantities are shown on plans and estimate sheets and specified in the traffic control plans the... Final Design Checklist Certification, Granite masonry or Stainless Steel Pier Protection for commonly used items of for!, the limits of pay items shall be clearly indicated on the.. Or Special Provisions extent of removal and staging These drawings show the Details of various construction items and are in. Sheet is a schematic outline with general information necessary to assist bidders in the! And is it complete the installation of guiderail posts criteria, facility specifications, and not language to! Dam Safety permit, or other properties and estimate sheets and specified in the traffic plans. Features of the Standard specifications information and/or for Roadway involvement it would be sent to quality Assurance in... Bases and Pavements be included in the plans, should be included in the Standard specifications is a body directions! Be included in the plans and specifications changes to the construction for removal structures. Than bridges installation of guiderail posts of scour critical bridges they in conformance report. Opportunity Obsession Entrepreneur, Articles N